Company News Your current location: home > news > Company News

What is the test by PV Cable Supplier?

Time:-0001-11-30 Hits:683

  Dent resistance test finished cable by PV Cable Supplier, Test Methods: 3 finished cable, length 2m, 25mm apart on the sample in each place, and rotate 90 degrees at making a total of four indentation, and indentation depth of 0.05mm copper wire with perpendicular. Samples were placed in three sections-15C, room temperature, +85 C test within the suitcase 3h, then the corresponding test in their suitcase on the test stick within the winding, test bar diameter 3D (D is the smallest cable diameter), each sample at least one after the notch in the circumference of the outer winding, the sample cooled to room temperature and at room temperature under the conditions of withstand voltage test (test voltage AC, 0.3kV/5min.) requirement: do not breakdown.

Sheath shrink test,Test Method: IEC60811, oven temperature: 120 degrees, the processing time: 1h, asked: ≤ 2%.Finished cable single combustion test, test method: EN60332-1-2 or IEC60332-1-2 requirements: the lower edge of the fixture from the starting point with the carbonation to be ≥ 50mm; burning down the lower edge of the extension of fuel from the first fixture to be ≤ 540mm.